|
|
|
Available Tenders |
|
Search Tenders |
View
Store Tenders |
Corrigendum
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
|
Tender No |
Description |
Issue Date |
Receipt of
Offer up to |
Opening Date |
Corrigendum |
CE/CON/LTD/EPC/2024/06 |
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for Doubling of Track between Lumding (km 191.522) (Including) to Dhansiri stations (km 241.00) (Excluding) (Total Length-49.478Kms) including Electrification & Signalling works in connection with Lumding -Tinsukia Jn - Dibrugarh doubling project of Northeast Frontier Railway in the state of Assam on Engineering, Procurement & Construction (EPC) Mode |
14/02/2025 |
28/02/2025
|
05/03/2025 5:30:00 PM |
Nil |
CE/CON/LTD/EPC/2024/05 |
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for Doubling of Track between Dhansiri (Including) (km 241.000) to Naojan stations (Excluding) (km 285.860) (excluding Dimapur yard from km 259.062 to km 260.782=1.72 Km) (Total Length- 43.140 Kms) including Electrification & Signaling works in connection with Lumding -Tinsukia Jn - Dibrugarh doubling project of Northeast Frontier Railway in the state of Assam on Engineering, Procurement & Construction (EPC) Mode |
07/02/2025 |
21/02/2025
|
26/02/2025 5:30:00 PM |
Nil |
CE/CON/MLG/MIS/2025/01 |
Maintenance of various Construction Offices, Rest houses and Residence of GM/Con, CAO/Con.s & FA & CAO/Con under the jurisdication of Dy. Chief Engineer/Con-1 Maligaon including housekeeping of GM/CON office building and premises, toilets, circulating area, drain by cleaning, sweeping and mopping etc of floors, toilets, drains and open areas to maintain hygiene and cleanliness and maintenance of existing/newly construction garden including planting seasonal flower, plants at GM/CON office, Landscape Garden from Gate No. 3 to GM/CON, Dy.CE/CON-1 office at Maligaon, Bunglows of GM/CON, CAO/CONs, PFA/CON for two years. |
11/02/2025 |
25/02/2025
|
25/02/2025 3:30:00 PM |
Nil |
CE/CON/JI/DDC/SLT/2025/01 |
Design, including investigation, analysis, preparation of drawings, design report, rectification of alignment, and supervision for Tunnel 25 and Tunnel 26, as well as ground investigation and design from Tunnel 27 (Portal 2) to Tunnel 1 (Portal 1) at Tupul Yard. The scope includes desk studies, traverse mapping, geophysical surveys, conventional investigation, logging, report preparation, and supervision. These tasks fall under the jurisdiction of the Deputy Chief Engineer (Construction) - 4, Imphal, as part of the Jiribam-Imphal New Broad Gauge Line Project (Manipur) of North East Frontier Railway. |
28/01/2025 |
18/02/2025
|
18/02/2025 3:30:00 PM |
Nil |
CE/CON/AG/FBW/SLT/2025/02 |
Flash Butt Welding of 60 Kg (90 UTS) Rails of 260 m panels or lesser length insitu or at any location decided by Railway, using contractor's self-propelled rail cum road /Mobile Flash Butt Welding Plant on running / non running lines with or without block or on cess of consolidated formation or on ballasted bed, after unloading of 260 m panels or lesser length of rails where required to connect them to form LWR / SWR, as per direction of Engineer In-charge from Ch: Km 3.95 to Km 84.473 in between stations Rahamatpur and Powakhali in connection with Arariya-Galgalia New Line Project. |
28/01/2025 |
11/02/2025
|
11/02/2025 3:30:00 PM |
Nil |
CE/CON/BH/PMS/2024/14 |
Providing project management service for Civil Engineering Works, Electrification Works and Signaling Works of New Single Broad Gauge line of Balurghat & Kamarpra Section (Length:13.787 km) in connection with Balurghat- Hilli New BG Railway Line Project of Northeast Frontier Railway (Construction)." |
21/01/2025 |
11/02/2025
|
11/02/2025 3:30:00 PM |
Nil |
|
|
|
|
|
|
First : Previous [ 1 ] Next : Last |
|
|
|
|
|
|