CE/CON/AK/EPC/2025/02 |
Construction of 2nd rail cum road bridge over river Brahmaputra including viaduct, retaining walls, embankment and minor bridges including track work, OHE work, signalling and telecom work, commissioning of stations and general work between Agthori and Kamakhya Station from km 393.980 to km 401.120. |
13/08/2025 |
27/08/2025
|
02/09/2025 3:30:00 PM |
1) 01 Dated: 05/06/2025
|
CE/CON/JI/MIS/2025/06 |
Site investigation, collection of field data, analysis, preparation of drawings, design in 6 copies, rectification of alignment for Tunnel 25 and Tunnel 26 and from Tunnel 27 (Portal 2) to Tunnel 1 (Portal 1) at Tupul Yard. The scope includes desk studies, traverse mapping, geophysical surveys, Sub-surface investigation, geological investigation, Geological global stability analysis, logging, report preparation, and supervision during construction of Tunnel No. 25 & Tunnel No.26 and proposed structures in Tupul yard from Tunnel 27 (Portal 2) to Tunnel 1 (Portal 1), major bridges, under the jurisdiction of the Deputy Chief Engineer (Construction) - 4,3-Imphal, Deputy Chief Engineer/Jiribam in connection with construction of Jiribam-Imphal New Broad Gauge Line Project (Manipur) of North East Frontier Railway. |
26/06/2025 |
10/07/2025
|
10/07/2025 3:30:00 PM |
Nil |