|
|
|
Available Tenders |
|
Search Tenders |
View
Store Tenders |
Corrigendum
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
|
Tender No |
Description |
Issue Date |
Receipt of
Offer up to |
Opening Date |
Corrigendum |
CE/CON/KM/DDC/SLT/2023/01 |
Name of work - Conducting Geotechnical investigation (along with preparation & submission of final report), developing bridge GADs, designing and developing detailed
structural drawings for foundation,
ubstructure, bearings, pedestal & bed block etc. for major/important bridges, Br. No. 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21 & 144 ( Total = 20 Nos.) along with submitting 5 set of hard copies and editable soft copies (with detailed
design calculations) in connection with doubling work of KIR-MFA section. |
02/10/2023 |
16/10/2023
|
16/10/2023 2:30:00 PM |
Nil |
CE/CON/B-S/PW/2023/04/RT1 |
Protection work of slopes in cutting and other ancilliary work under juridiction of DY.CE/CON/BHRB & DY.CE/CON/KAWNPUI in connection with the construction of
new BG Railway line from Bairabi to Sairang (Mizoram) Project. |
29/09/2023 |
13/10/2023
|
13/10/2023 3:30:00 PM |
Nil |
CE/CON/B-S/MIS/2023/03/RT1 |
Execution of Civil Engineering work for construction of Double storied Service building & maintenance shed for sick line, covered washing pit line shed, cat walk with water hydrant & pathway, Coach watering facility, Track machine staff office cum Rest house & siding Platform including electrical
works at Sairang Yard and Goods office, FOIS, Merchant office & labour Rest Room at Mualkhang & Sairang Yard in connection with Bairabi-Sairang New BG Rail Line Project (Mizoram). |
29/09/2023 |
13/10/2023
|
13/10/2023 3:30:00 PM |
Nil |
CE/CON/JT/PW/2023/05/RT1 |
Protection of high embankment and deep cutting and other ancillary works under the jurisdiction of Dy.CE/CON/JRBM between station JRBM-VNGP-Tunnel No. 1 in connection with construction of new BG Railway line from Jiribam to Tupul (Imphal). |
26/09/2023 |
10/10/2023
|
10/10/2023 3:30:00 PM |
Nil |
CE/CON/AG/PW/2023/15 |
Construction of Guide bund of Br no 166, and other ancillary works in connection with Araria - Galgalia new BG line project of N. F. Railway. |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/BH/MB/2023/10 |
Balance work of Sub-structure and Superstrucure of major Bridge No. 4
(5x45.7 m OWG Through Welded Steel Girder at Ch - 1.385 km ), Bridge No. 16 (4x12.2m
PSC Slab at Ch- 9.53 km ), Bridge No. 20 (3x12.2m Composite Girder at Ch - 14.508 km), Bridge No. 26 (3x12.2 m PSC slab at Ch - 20.185km) and Br No. 36 (3x45.72m OWG
Through Welded Steel Girder at Ch. - 27.93 km) between Balurghat to Hili and other
ancillary works in connection with new BG line project from Balurghat to Hili of N.F.
Railway (Construction). |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/MP/PMS/2023/04 |
Appointment of Project Management Services Agency for Providing Project Management
Services for work of Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works on Engineering, Procurement & Construction (EPC) Mode. |
25/09/2023 |
09/10/2023
|
09/10/2023 3:30:00 PM |
Nil |
CE/CON/KM/MB/2023/09 |
Construction of Sub-Structure and Super-structure of Major Bridge No. 03 (4x6.1 m PSC Slab at Ch-3.940km), Bridge No. 04 (5x12.2 m PSC Slab at Ch -6.343 km ), Bridge No. 05 (1x12.2 m PSC Slab at Ch - 7.521 km ), Bridge No. 06 (4x6.1 m PSC Slab at Ch-9.769 km),
Bridge No. 07 (5x6.1 m PSC Slab at Ch-11.057 km), Bridge No. 08 (3x6.1 m PSC Slab at Ch-12.997 km), Bridge No. 09 (3x12.2 m PSC Slab at Ch -13.836 km ), Bridge No. 10 (3x6.1 m PSC Slab at Ch-15.692 km), Bridge No. 11 (5x6.1 m PSC Slab at Ch-18.962 km), Bridge
No. 12 (4x12.2 m PSC Slab at Ch - 18.065 km ), Bridge No. 13 (1x45.7 m OWG at Ch -
18.962 km ), Bridge No. 14 (2x45.7 m OWG at Ch- 20.475 km ), Bridge No. 15 (3x6.1 m
PSC Slab at Ch-22.543 km), Bridge No. 16 (8x45.7 m OWG at Ch - 24.299 km), Bridge No. 17 (5x12.2 m PSC Slab at Ch - 26.64 km ), Bridge No. 18 (7x12.2 m PSC Slab at Ch - 27.85 km ), Bridge No. 19 (4x12.2 m PSC Slab at Ch - 29.773 km ), Bridge No. 20 Double track (6x12.2 m PSC Slab at Ch - 31.77 km ), Bridge No. 21 Double track (7x12.2 m PSC Slab at Ch - 33.255 km ) and Bridge No. 144 (1x6.1+3x12.2+1x6.1 m PSC Slab at Ch -35.239km ) between Katihar and Mukuria in connection with Katihar - Mukuria Doubling project of N.F. Railway (Construction). |
14/09/2023 |
05/10/2023
|
05/10/2023 3:30:00 PM |
Nil |
CE/CON/NA/PA/2023/05 |
Construction of New Foot over Bridge at Bongaigaon Staion and extension of Foot over Bridge at Chaprakata station in connection with NBQ-AGT BG Doubling project. |
19/09/2023 |
03/10/2023
|
03/10/2023 3:30:00 PM |
Nil |
CE/CON/ZT/FLS/2023/04 |
Conducting Final Location Survey (FLS) for New BG Railway line of various projects with Geo-Technical Investigation, preparing EIRR & submission of DPR as per Railway Board's latest guide lines complete in all respect. |
15/09/2023 |
29/09/2023
|
29/09/2023 3:30:00 PM |
1) 02 Dated: 30/08/2023 2) 01 Dated: 30/08/2023
|
|
|
|
|
|
|
First : Previous [ 1 ] Next : Last |
|
|
|
|
|
|