Back to Home Page

   
 

Available Tenders

 
 Search Tenders

View Store Tenders

Corrigendum

 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Receipt of Offer up to

Opening Date

Corrigendum

CE/CON/TB/EPC/2026/01

Construction of New intermediate Station at Moupur, Assam, CH- 19/064 Km in between Kamalajari and Byrnihat, including balance work from CH- 9/500 km to 19/500km and track linking from kamalajari yard with other ancillary works, in connection with Tetelia-Byrnihat New Line Project

13/03/2026

27/03/2026

02/04/2026 12:00:00 AM

Nil

CE/CON/FT/EPC/2026/03

Doubling of Track between Furkating (331.138 km) (excluding) and Selenghat stations (including) up to km 394.30 (63.162km) including Electrification and Signalling works in connection with Furkating - New Tinsukia doubling project of Northeast Frontier Railway in the state of Assam on EPC mode

06/03/2026

20/03/2026

26/03/2026 3:30:00 PM

Nil

CE/CON/BS/MIS/2026/01

Execution of balance work of Sairang station building including extension of existing building, subway below lobby area. concourse, facade, passenger circulating area, PP shed, platform surfacing, horticulture/ landscaping work, approach road to Sairang station building /circulation area, retaining wall, side drains, longitudinal drains, fencing, ETP/STP, Hydrant pipe along with yard drain, providing lifts, escalator, Provision for electrification of station building including station approach road and station circulating area and Shifting of S and T utilities and relocation in connection with upgradation of SAIRANG Station etc. in connection with construction of Bairabi-Sairang New BG Rail line Project (Mizoram).

20/02/2026

06/03/2026

06/03/2026 3:30:00 PM

Nil

CE/CON/LF/BLD/2026/02

Construction of 04 units Type-IV and 01 Officer Rest House at Mariani for BG Double line project from Naojan to Furkating ( Package -III) under DY CE/CON/DL/MXN in connection with BG Double line project from Lumding to Furkating in N.F.Railway.

12/02/2026

26/02/2026

26/02/2026 3:30:00 PM

Nil

CE/CON/SUR/FLS/2025/02

Conducting Final Location Survey (FLS) for (i) New BG Railway Line Projects (Appx. Length equal to 900.00 km), (ii) Gauge Conversion/Doubling/ Third line/ 3rd and 4th line (Appx. Length equal to 600.00 km.) of various projects in India, Nepal and Bangladesh (iii) Preliminary Engineering cum Traffic Survey from Gangtok to Nathula (Appx. Length equal to 240.00 km) in the State Sikkim with Geo-Technical Investigation. Preparing FIRR/EIRR, EPC document and submission of DPR etc. as per Railway Board's latest guide lines complete in all respect

06/02/2026

20/02/2026

20/02/2026 3:30:00 PM

1) 01
Dated: 13/01/2026

CE/CON/AK/PMS/2025/06

"Providing project management services Engineering, Procurement and Construction (EPC) contracts and other works contracts ( Item rate contracts) for Doubling Project between Agthori station (km 393.380) to Kamakhya station (km 401.120) including Construction of 2nd rail cum road bridge over river Brahmaputra including viaduct, retaining walls, embankment and minor bridges including track work, OHE work, signaling and telecom work and general work in connection with Agthori - Kamakhya doubling project of Northeast Frontier Railway in the state of Assam." and "Engineering, Procurement and Construction (EPC) contracts and other works contracts (Item rate contracts) for Doubling of Track between Azara (163.000 km) (including) and Kamakhya stations (including)up to km 176.000 (13 km) including Electrification and Signalling works in connectionwith New Bongaigaon -Goalpara Town - Kamakhya doubling project of Northeast Frontier Railway."

04/02/2026

18/02/2026

18/02/2026 3:30:00 PM

1) 02
Dated: 29/01/2026
2) 01
Dated: 29/01/2026

CE/CON/BNS/MIS/2026/01

At Banarhat station: Construction of ORH cum camp office with boundary wall, construction of RBG building, circulating area with station approach road, passenger waiting area along with passenger amenities, 1 No SSP, 2 No location huts, 1 No block hut at Y leg, construction of 01 No. new 3 m wide FOB, extension of PF2 along with construction of new PF No 3, protection work at existing Hathi Nala, execution of formation & track works for BNQ yard remodeling including supply of ballast, formation protection works, utility shifting and general electrical works in connection with Banarhat (India)- Samtse (Bhutan) railway BG new line project.

29/01/2026

12/02/2026

12/02/2026 3:30:00 PM

Nil

CE/CON/KK/EPC/2025/09

Balance work of Earthwork in formation, blanketing and protection works in between Km 12.400 to 13.600, Km 17.800 to Km 18.00, Km 19.100 to Km 22.520, Km 23.700 to Km 24.500, and Km 27.900 to Km 30.300 (Total 8.02 Km), Construction of 01 no. island PF at KDPR, PP shed at KDPR, Circulating area with approach road at KDPR, Balance works of Minor Br/RUB 5A, 6A, 6B, 9A, 11A, 11B and 11C (Br. No. 11 C - for both existing and proposed DL), construction of 16 nos. Type-II quarters and dismantling of existing 16 nos. quarters at KDPR station other ancillary works in between section Kuretha-Kumedpur in connection with Katihar- Kumedpur doubling project of N. F. Railway (Construction) on EPC mode

21/01/2026

04/02/2026

10/02/2026 3:30:00 PM

Nil

         

First : Previous [  1 ] Next : Last  

         
 

Powered by WebX